How much stuff could a landscaper chuck, when a landscaper does chuck stuff?
Thinking the other night, I contemplated how much material we actually move in a averge job. I took a typical 2,000 square foot sod job and came up with this.
2,000′ old sod removal to dump approx. 130 wheelbarrows of material.
14 yards soil mix installed is approx. 160-180 wheelbarrows of soil.
40 wheel barrows of new sod.
My next question was. How much does the material weigh?
The old sod weighs approx. 4,000 lbs.
The soil mix approx. 13,000 lbs.
The new sod approx. 6,000 lbs.
In this particular sod job I figured landscapers move about 22,000 lbs of material. That’s right 11 tons.
The next question I asked myself was, How much material do landscapers move per hour. Assuming the job is approx. 40 man hours to install with a three man crew. I came up with 550 lbs. per hour. This figure is low because I put in no time in for the stripping of old sod, soil moving, grading, fertilizing and liming and of course the installation of new sod. So probably add about 300 lbs. per hour in actual moving of material. 850 lbs. of material gets moved per man hour.
Maybe that’s a good reason to hire a landscaper. That is a lot of weight to haul around.